![]() A prime example of a digital workflow in construction. Züblin AG is now fully exploiting the advantages of BIM during implementation thanks to Allplan Bimplus. On the basis of this 3D planning, the company Ed. The engineering firm Werner Sobek AG, which was responsible for the structural, shell and reinforcement design of the underground through-station concourse, therefore relied largely on 3D for the design. ![]() Without the use of powerful BIM software and production processes specially developed for the project, the implementation of the building would be impossible. Special attention will be paid to the station concourse of the new underground through-station in Stuttgart, designed by ingenhoven architects.Īn architecturally highly sophisticated shell roof, supported by 28 geometrically highly complex chalice-shaped columns, qualifies this as a masterpiece of modern architecture that the world has never seen before. In addition, engineering history is being written here, both in terms of design and technology. ![]() But it‘s not just the size that makes this project so impressive. Within the whole project, five new stations, about 120 kilometers of new railways and two new quarters are being built. Stuttgart 21 as a part of the Stuttgart-Ulm rail project is one of the largest European infrastructure projects.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |